9th March 2015 - Enspire Solutions completed a second stage design of protective solutions for a high-rise modern structure with a national embassy occupying several of the building floors. The design provided protective measures against VBIED detonations at a standoff and in close distance. The work included the performance of vulnerability analysis and quantitative risk-based design of protective measures. Working alongside the project architect, the project has entered its implementation stage.