Enspire Solutions were appointed to perform a Vehicle Dynamic Assessment for Hostile Vehicle Mitigation scheme for the drop-off location of one of Europe's largest shopping malls. The assignment included the development of several mitigation strategies for different risks, considering the existing operational conditions of the site. The shopping mall vehicle approach is part of an urban intersection of Underground and Overground train stations and a three-lane public road.
A key requirement was to define mitigation measures that would ensure the protection of critical assets whilst not interfering with the normal movement of either pedestrians or vehicles.